2009

The Appropriate standard time of container unioading and loading and its adjustment to the current effectiveness formula at PT Indra Jaya Swastika

Filed under: Uncategorized — Tags: , , , — dvanhlast @ 7:31 am

Author : HARTANTO;, BUDI

In a well-established company, managers will be happy to see their I subordinates work hard with idle time minimization. However, it will be useless if they cannot identify whether the work is already effective or not. Therefore, it is essential to have a standard time, which provides an objective means of evaluating a worker?s level of performance rather than basing it on personal assumptions or biases. Here, the writers are trying to contribute to PT. Indra Jaya Swastika, where they had a four-month internship, in formulating Standard Time of IJS main operations (Container Unloading and Loading processes) as a benchmark that enables IJS to measure its employees? performance. The writers use Stopwatch Time Study Analysis in formulating the benchmark by dividing the total Unloading and Loading cycles into work elements so that times are collected for each work element, thus we can calculate Total Standard Time for each cycle. In the end, the writers come up with the Standard Time of Unloading and Loading Process of 6 minutes 41 seconds and 9 minutes 28 seconds respectively. Furthermore, based on the Standard Times findings, the writers also found that the IJS current effectiveness measurement formula is inappropriate and therefore should be replaced or modified.

Keyword : work measurement, time study, standard time, benchmark

Sumber : http://repository.petra.ac.id/1642/

Perancangan peningkatan produktivitas pada perusahaan aluminium X

Filed under: Uncategorized — Tags: , , — dvanhlast @ 7:31 am

Author : WIGUNA, MALIA

Perusahaan Aluminium X ini merupakan Home Industry yang bergerak di bidang aluminium yang mana diperlukan untuk kebutuhan rumah tangga, kantor, serta toko. Perbaikan yang direncanakan meliputi proses produksi yang ada di home industry tersebut, serta yang berhubungan dengan proses produksi tersebut. Sesuai dengan masalah-masalah yang timbul di home industry tersebut, maka konsep perancangannya mengacu pada penyelesaian masalah-masalah tersebut. Oleh karena itu dalam perancangannya direncanakan adanya perbaikan layout pabrik, pencatatan logistik, pengukuran waktu produktif, dan pedoman penggunaan material.

Keyword : production planning, time study, work measurement

Sumber : http://repository.petra.ac.id/2741/

Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.

Filed under: Uncategorized — Tags: , , , — dvanhlast @ 7:31 am

Author : SUBIYANTO, ANDRI

PT. Suparma Tbk. merupakan perusahaan produsen kertas yang memiliki jumlah tenaga kerja yang besar. PT. Suparma Tbk. ingin mengetahui tingkat produktivitas operator seksi Deinking Plant (DIP) dan menghendaki adanya peningkatan tingkat produktivitas operator seksi Deinking Plant (DIP) Tujuan yang ingin dicapai PT. Suparma Tbk. adalah penetapan waktu baku dari tiap- tiap elemen kerja yang ada di tiap proses yang akan digunakan untuk perhitungan kebutuhan tenaga kerja di tiap-tiap proses seksi Deinking Plant (DIP). Metode yang digunakan untuk penetapan waktu baku adalah dengan cara pengukuran langsung dengan menggunakan metode jam henti. Kesimpulan yang diambil adalah jumlah operator seksi Deinking Plant (DIP) yang semula berjumlah 17 orang untuk satu shift, mengalami pengurangan sebanyak 5 orang menjadi 12 orang yang bertugas dalam satu shift.

Keyword : personnel management, time study, standard time, productivity rate

Sumber : http://repository.petra.ac.id/2762/

Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya

Filed under: Uncategorized — Tags: , , , , — dvanhlast @ 7:31 am

Author : TAUFIK, BONIFASIUS

Penentuan Waktu Baku Dan Analisa Perhitungan Kebutuhan Tenaga Kerja Seksi Paper Machine 1, 2 dan 3 PT. SUPARMA Tbk. Surabaya ini merupakan tugas yang dibuat oleh mahasiwa yang sedang melaksanakan tugas akhir. Tugas ini dilaksanakan di area Paper Machine 1,2,3. Permasalahan yang dihadapi adalah rendahnya produktifitas operator di tiap PaperMachine. Tujuan dari tugas ini adalah meningkatkan produktifitas operator serta menghitung waktu baku untuk tiap elemen kegiatan di tiap Paper Machine. Metode penelitian yang digunakan adalah perhitungan waktu baku. Tugas ini menghasilkan perhitungan waktu baku yang optimal untuk setiap elemen kegiatan, jumlah operator yang bertugas, dan peningkatan produktifitas operator di tiap Paper Machine.

Keyword : production planning, time study, work sampling, paper machine, suparma

Sumber : http://repository.petra.ac.id/2768/

Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya

Filed under: Uncategorized — Tags: , , , — dvanhlast @ 7:31 am

Author : JAYAPUTRA, IWAN

Penentuan Waktu Baku Dan Analisa Perhitungan Kebutuhan Tenaga Kerja Bagian Paper Machine 7 PT. SUPARMA Tbk. Surabaya ini merupakan tugas yang dibuat oleh mahasiwa yang sedang melaksanakan tugas akhir. Tugas ini dilaksanakan di area Paper Machine 7. Permasalahan yang dihadapi adalah rendahnya produktifitas operator di PaperMachine 7. Tujuan dari tugas ini adalah meningkatkan produktifitas operator serta menghitung waktu baku untuk tiap elemen kegiatan di Paper Machine 7. Metode penelitian yang digunakan adalah perhitungan waktu baku dan sampling pekerjaan. Tugas ini menghasilkan perhitungan waktu baku yang optimal untuk setiap elemen kegiatan, jumlah operator yang bertugas, dan peningkatan produktifitas operator di Paper Machine 7.

Keyword : time study, work measurement, paper machine, suparma

Sumber : http://repository.petra.ac.id/2785/

Analisa perbandingan nilai produktivitas tenaga kerja dengan menggunakan metode standard dan aktual (studi kasus pada proyek X dan Y)

Filed under: Uncategorized — Tags: , , , — dvanhlast @ 7:31 am

Author : MULIANA, EKA

Persaingan dalam dunia konstruksi menuntut kontraktor untuk mengefisiensikan harga tender, sehingga diperlukan perhitungan produktivitas tenaga kerja yang secara akurat mampu mendekati kenyataan dilapangan. Metode untuk mengestimasi produktivitas yang digunakan umumnya di Indonesia diantaranya adalah dengan standar SNI 2001 dan Soedrajat 1994. Tujuan penelitian ini adalah mendapatkan dan membandingkan nilai produktivitas tenaga kerja pada proyek X dan Y dengan metode foto, time study, SNI 2001 dan Soedrajat 1994 pada pekerjaan pembesian dan bekisting. Penelitian ini dilakukan pada 2 proyek rumah tinggal yang sedang dikerjakan di Surabaya. Dari hasil studi dapat ditentukan bahwa hasil 4 metode tersebut menunjukkan kecocokan pada pekerjaan pembesian yang lengkap meliputi balok, kolom dan plat. Pada pekerjaan pembesian tidak lengkap, bekisting tanpa perancah, dan bekisting dengan perancah, metode foto dan time study hasilnya tetap konsisten sedangkan standar SNI 2001 dan Soedrajat 1994 memerlukan faktor pengali yang perlu diteliti lebih mendalam.

Keyword : productivity, sni 2001, soedrajat 1994, time study

Sumber : http://repository.petra.ac.id/3442/

Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama bulan September 2003 – Nopember 2003

Filed under: Uncategorized — Tags: , , , , , , , — dvanhlast @ 7:31 am

Author : ANDREANA, AMELIA

Produktivitas menentukan keberhasilan pelaksanaan schedule proyek konstruksi. Dalam menentukan produktivitas, banyak mengalami kesulitan karena produktivitas tidak dapat diukur secara akurat melainkan melalui pendekatan. Salah satu metode menetukan produktivitas adalah time study. Pengamatan dilakukan berdasarkan waktu kerja, waktu istirahat, dan waktu yang tersedia untuk bekerja. Penelitian ini bertujuan menetukan standar waktu, produktivitas, dan membandingkan upah tenaga kerja dengan standar upah di Surabaya. Produktivitas merupakan hasil kali efisiensi dan utilisasi. Efisiensi adalah perbandingan antara standar waktu dan waktu kerja. Utilisasi adalah perbandingan antara waktu kerja dan waktu yang tersedia untuk bekerja. Untuk membandingkan upah kerja dilakukan perhitungan upah tiap satu satuan pekerjaan. Analisa produktivitas Ruko Gubeng Station, menunjukkan bahwa penentuan produktivitas tenaga kerja sangat dipengaruhi oleh waktu kerja. Waktu kerja yang melebihi standar waktu menyebabkan efisiensi kecil, sehingga tingkat produktivitas juga kecil. Misalkan pada pembuatan bekisting balok diperlukan waktu 404 menit untuk menghasilkan 40.67 m 2 sehingga didapat standar waktu 94.897 menit, maka didapat efisiensi 0.235, utilisasi 0.962, dan produktivitas 0.226. Hasil perbandingan antara upah satuan kerja dan satuan standar upah pada pekerjaan bekisting balok menunjukkan bahwa upah satuan kerja (Rp 5437.14/ m 2 ) lebih rendah dari satuan standar upah di Surabaya (Rp 7793.5/m 2 ).

Keyword : contruction, management, time study, time standard, utilization, efficiency, productivity, salary standard

Sumber : http://repository.petra.ac.id/4584/